Boston Water and Sewer Commission
This article includes a list of general references, but it lacks sufficient corresponding inline citations. (July 2019) |
The Boston Water and Sewer Commission (BWSC) serves retail customers with water services in Boston, Massachusetts. It purchases water wholesale from the Massachusetts Water Resources Authority (MWRA).
The largest retail water and wastewater utility in New England, BWSC owns and operates the drinking water distribution, wastewater collection and stormwater drainage systems; which utilise 1,015 miles (1,633 km) of water main and 1,435 miles (2,309 km) of sewer pipe and storm drain. It was created in 1977 taking control of the city operated sewer system and the state operated treatment facilities. [1]
The basic Boston water distribution system opened in 1848, and the wastewater collection system in 1883. In a response to the dangers posed to Boston by severely deteriorated water distribution and wastewater collection systems, BWSC was created in 1977 by an act of the Massachusetts legislature as a public instrument, a corporate separate and apart from the City of Boston. The Enabling Act empowered the BWSC to independently set rates and charges for the water distribution and wastewater collection services it provides and entrusted BWSC to improve and maintain the integrity of its systems.
BWSC purchases water from the Massachusetts Water Resources Authority (MWRA), a wholesale supplier of water and wastewater services. MWRA collect water in the Quabbin Reservoir, connected by a 65 miles (105 km) tunnel to Boston, and enters BWSC distribution system at 27 metered sites. When full, the Quabbin Reservoir holds 412 billion US gallons (1.56×109 m3), making it one of the largest man-made public water supplies in the country.
In the 40 years since its creation, BWSC has relaid or relined over 300 miles (480 km) of aging, and claims to have reduced the amount of water being lost through system leaks by 50 million US gallons (190,000 m3) per day. It has also, in conjunction with the MWRA, eliminated 81 miles (130 km) of combined sewer overflows to Boston Harbor. In 2003, BWSC installed an automated reading device on every meter, that allows it to track daily consumption.
The BWSC is home to the largest solar array in the City of Boston. In June 2007, the City of Boston became one of thirteen inaugural Solar America Cities under the Solar American Initiative led by the U.S. Department of Energy and launched Solar Boston, a half-million-dollar program to encourage the widespread adoption of solar energy in Boston. Through Solar Boston, the City will:
(a) Develop a strategy for the installation of solar technology throughout Boston including mapping feasible locations, preparing a project-labor agreement, and planning the citywide bulk purchase, financing, and installation of solar technology, (b) Work with local organizations to maximize Boston 's participation in state incentive programs and innovative financing initiatives (c) Create a successor non-profit organization to implement the long-term goals of the partnership, (d) Solar Boston partners include the U.S. Department of Energy, the Massachusetts Technology Collaborative, local utilities and unions, an anonymous foundation, and a broad range of local, regional, and national clean energy stakeholders including the US Department of Energy.[2]
2015 Water and sewer rates
[edit]Consumption
(Cu ft/day) |
Water rate Per 1000 |
Water Rate Per 1000 |
Sewer rate Per 1000 |
Sewer Rate Per 1000 |
---|---|---|---|---|
First 19 | 49.00 | 6.550 | 63.43 | 8.480 |
Next 20 | 51.29 | 6.856 | 65.38 | 8.741 |
Next 50 | 53.41 | 7.140 | 66.70 | 8.917 |
Next 260 | 56.79 | 7.592 | 70.37 | 9.408 |
Next 950 | 59.25 | 7.921 | 74.26 | 9.928 |
Over 1,299 | 61.33 | 8.199 | 76.82 | 10.270 |
- Table of rates effective January 1, 2015[3]
The typical customer pays just over a penny per gallon: 'The average one family customer using 180 US gallons (680 L) per day ("GPD”) in 2015 will be charged $84.30 per 31-day month or $992.56 annually. A multi-unit residence using 600 GPD will be charged $291.20 per 31-day month or approximately $3,428.64 annually. A small commercial property using 4,000 GPD will be charged $2,119.45 per 31-day month or approximately $24,954.81 annually.'[3]
References
[edit]- ^ Ian Douglas Cities: An Environmental History. I.B.Tauris, Sep 26, 2013 pg. 150
- ^ "Solar Boston | City of Boston". Archived from the original on 2010-12-24. Retrieved 2010-11-13.
- ^ a b "Water and Sewer Rates". Archived from the original on 2015-05-08. Retrieved 2015-05-05.
External links
[edit]- "Home | Boston Water and Sewer Commission". Bwsc.org.
- "Environment". Boston.gov. February 2016.
- Historic American Engineering Record documentation, all filed under Boston, Suffolk County, MA
- HAER No. MA-65, "East Boston Pumping Station, Chelsea Street at Chelsea Creek", 16 photos, 1 color transparency, 3 data pages, 2 photo caption pages
- HAER No. MA-120, "Deer Island Pumping Station", 36 photos, 44 data pages, 6 photo caption pages
- HAER No. MA-128, "East Boston Steam Pump Station, 20 Addison Street", 12 photos, 86 data pages, 2 photo caption pages